「 #沙田至中環綫 」第一期需 62 列車,服務烏溪沙 至 屯門 各站的乘客: metroride.hk/1UjjDPh ?
除 「 #IKK 列車 」需全面重組外,全新由「中國中車公司」生產,每列有八卡車廂的「#東西綫列車 」(暫名)早前亦已到港 ?
車廂同樣有「 動態路線圖」、「通道端螢幕」;機件則盡量參考「 #IKK列車 」的配置,方便日常維修 和 訓練 ?
「#東西綫列車 」預計於 2017 年第一季前 / 後,先在 #馬鞍山綫 投入服務
「沙田至中環綫」第一期:
metroride.hk/SCLPhase1
Shatin to Central Link Phase 1 will need 62 trainsets to serve passengers along Wu Lai Sha to Tuen Mun Stations
Besides IKK trains will receive a full reformation, new East West Line Trains that will join the line (tentative name) had also arrived Hong Kong
The East West Line Train(tentative name) are manufactured by Chinese CRRC company, eight carriages for each set
Dynamic Route Maps and Gangway End Displays are also installed on the trains while instruments are similarly configured with IKK trains for an easier handing and maintenance
It is estimated the train will join Ma On Shan line before or after Q1, 2017