metroride.hk

港鐵故障消息 MTR Service Update

In the last non-traffic hours,

the first test train on East Rail Line entered sections of tracks that were temporarily taken over by the new signalling system – Siemens Trainguard MT ⬇️

http://youtu.be/wBrWBqK8Ypo

The new signalling system enables East Rail Line to operate 32 trains per hour maximum in peak hours while current is 24

Normal operations has been resumed on the tracks after different trial runs